Operates the Kwinana reactor building, solvent recovery column and utilities continuously from the central control room and the field, keeping the plant within its safe operating limits, responding to alarms and abnormal situations and handing over accurately between shifts.
What the team is accountable for
- Operate reactors, distillation, heat exchangers, pumps and valves within limits
- Monitor the control system and respond to alarms
- Complete field rounds and record readings
- Start up and shut down process units to procedure
- Hand over the plant accurately at every shift change
How we know it is working
Who works here
Bruce Kalinowski
Bruce runs the four-panel operations roster and has spent nineteen years at Kwinana, starting as an outside operator on the reactor building.
Wayne Djakovic
Wayne supervises panel C from the control room, issues permits for operations and has worked shifts at Kwinana for fourteen years.
Tahlia Brennan
Tahlia completes field rounds on the reactor building and solvent recovery unit, takes samples and supports isolations, and joined Hydra three years ago.
Where the work is recorded
Control Room Shift Log
Records every operating event, batch, reading, sample result, override and handover from the control room and the field for each shift.
Incident and Process Safety Event Register
Logs injuries, near misses, losses of containment, safety system activations, limit excursions and environmental events with tier, investigation and actions.
Permit and Isolation Register
Tracks every permit to work, isolation certificate and blind from request to close-out and records permit audits.
Assessment tasks in this department
Start up the solvent recovery column after the pump repair
You are the panel operator for the solvent recovery unit on day shift, Panel C.
IntermediateRespond to a reactor high temperature abnormal situation
You are the panel operator for the reactor building on Panel C during a simulator exercise.
Documents the scenarios use
- Abnormal Situation and Emergency Shutdown Response Procedure Procedure
- Solvent Recovery Column Start-up and Shutdown Procedure Procedure
- Permit to Work and Plant Isolation Procedure Procedure
- Incident and Process Safety Event Report Form Form
- Ferric Coagulant Batch Reaction and Adjustment Procedure Procedure