Start up the solvent recovery column after the pump repair
You are the panel operator for the solvent recovery unit on day shift, Panel C.
What has happened
The solvent recovery column has been shut down and under nitrogen since the reflux pump seal failure on 2 September. Permit PW-26-0781 is closed, but the blind list still shows two blinds fitted on the reflux line and the pre-start-up checklist has not been started. The emergency shutdown system was function tested in July. Cooling water is available but the steam header is at the low end of its normal pressure because the boiler is on one burner. Wayne Djakovic will authorise each stage and Tahlia Brennan is the outside operator. The laboratory can turn around an overhead sample in 40 minutes. Bruce Kalinowski expects the column on specification by the end of the shift with every step in the shift log.
Deliverables
- Signed pre-start-up checklist with blind reconciliation
- Inerting and leak test record
- Shift log entries for every stage of the start-up
- Shift handover report
Documents to use
Systems to use
Units of competency
Current on training.gov.au for the Chemical, Hydrocarbons and Refining as at 10 September 2026.
PMAOPS310Operate and troubleshoot distillation systemPMAOPS205Operate heat exchangersPMAOPS315Operate and troubleshoot process control systemsPMAOPS411Manage plant shutdown and restartPMAOPS348Operate safety, protection and shutdown systemsQualifications
PMA30120Certificate III in Process Plant OperationsPMA40116Certificate IV in Process Plant TechnologyWhat to look for
Evidence guide
The student must find and resolve the blind list discrepancy before inerting, must complete the leak test for the full period and must not skip ramp steps because of time pressure. Look for the low steam pressure recognised as a constraint, product routed to off-specification until the laboratory confirms, every stage authorised and logged, and a handover report that a night operator could take over from.