| Code | Document | Type | Owner | Version | Next review |
|---|---|---|---|---|---|
| HYD-POL-001 | Process Safety and Major Hazard Policy States the commitment of Hydra to preventing major accidents at its major hazard facility and sets out the framework of | Policy | Site General Manager | 4.2 | 9 January 2027 |
| HYD-POL-002 | Health, Safety and Environment Policy Commits Hydra to the health and safety of every person at its sites and to the protection of the environment, and sets o | Policy | Process Safety Manager | 3.5 | 16 February 2027 |
| HYD-POL-003 | Dangerous Goods Storage and Handling Policy Sets the requirements for storing, handling, transferring and transporting dangerous goods at Hydra sites in line with t | Policy | Terminal Manager | 2.4 | 24 March 2027 |
| HYD-POL-004 | Management of Change Policy Ensures that every change to plant, process, chemicals, control systems, procedures, organisation or staffing is assesse | Policy | Technical Services Manager | 3.0 | 7 November 2026 |
| HYD-PRO-110 | Solvent Recovery Column Start-up and Shutdown Procedure Describes the sequence, checks and limits for starting up and shutting down the solvent recovery distillation column so | Procedure | Production Superintendent | 5.1 | 30 April 2027 |
| HYD-PRO-120 | Permit to Work and Plant Isolation Procedure Sets out how work on plant is authorised by permit and how process, electrical and mechanical energy sources are isolate | Procedure | Process Safety Manager | 4.0 | 12 March 2027 |
| HYD-PRO-130 | Bulk Fluid Transfer and Tank Gauging Procedure Describes how bulk chemicals are received from road tankers and ships, transferred between tanks and loaded to road tank | Procedure | Terminal Manager | 3.3 | 18 May 2027 |
| HYD-PRO-140 | Abnormal Situation and Emergency Shutdown Response Procedure Describes how operators recognise, respond to and recover from abnormal process situations and safety system activations | Procedure | Production Superintendent | 3.2 | 6 April 2027 |
| HYD-FRM-150 | Permit to Work and Isolation Certificate Form Authorises work on plant and records the isolations, preparation, gas tests and controls that were in place before the w | Form | Process Safety Manager | 4.1 | 12 March 2027 |
| HYD-FRM-151 | Incident and Process Safety Event Report Form Used by any worker to report an injury, near miss, hazard, loss of containment, safety system activation, safe operating | Form | Process Safety Manager | 2.3 | 16 February 2027 |
| HYD-TPL-160 | Management of Change Request Template Used by the person proposing a change to describe it, assess its hazards and its effect on the safety case and record th | Template | Technical Services Manager | 2.2 | 7 November 2026 |
| HYD-TPL-161 | Shift Handover Report Template Used by the outgoing shift to record the state of the plant, the abnormal conditions, the permits, overrides and actions | Template | Production Superintendent | 3.0 | 2 June 2027 |
| HYD-REG-170 | Safety Critical Equipment Register Lists the equipment and systems that the safety case relies on to prevent or mitigate a major accident, with the perform | Register | Maintenance and Integrity Manager | 6.0 | 1 July 2027 |
| HYD-PLN-180 | Site Emergency Response Plan Sets out how Hydra responds to emergencies at the Kwinana plant and terminal including chemical releases, fires, injurie | Plan | Process Safety Manager | 5.3 | 20 April 2027 |
| HYD-PRO-115 | Ferric Coagulant Batch Reaction and Adjustment Procedure Describes how a batch of ferric sulfate or ferric chloride coagulant is charged, reacted, monitored, sampled, adjusted a | Procedure | Production Superintendent | 4.4 | 14 May 2027 |