Sample, test and adjust ferric chloride batch FC-26-0210
You are a laboratory technician in Laboratory and Product Quality working with the outside operator.
What has happened
Reactor 2 is at the end of the reaction hold on ferric chloride batch FC-26-0210 and the panel operator is waiting for the laboratory result before the batch can be adjusted and transferred to tank T-206. Last week an outside operator was splashed while sampling because the glove cuff did not overlap the sleeve, so sampling protective equipment is under close attention. The specification for this grade sets iron content, free acid, specific gravity and insolubles bands. The first result usually needs a small acid or water adjustment, which the laboratory calculates and the panel operator applies before a resample. Patrick Nguyen wants the results in the shift log within 45 minutes of the sample arriving.
Deliverables
- Completed batch sheet with raw results and adjustment calculation
- Shift log entries for the first sample, the adjustment advice and the resample
- Sampling protective equipment check note
- Batch release entry authorising transfer
Documents to use
Systems to use
Control Room Shift Log
Records every operating event, batch, reading, sample result, override and handover from the control room and the field for each shift.
Bulk Transfer and Tank Inventory Register
Records every receipt, internal transfer and dispatch of bulk product with tank, quantity, gauging and reconciliation.
Units of competency
Current on training.gov.au for the Chemical, Hydrocarbons and Refining as at 10 September 2026.
PMAOPS319Adjust batchPMAOPS220Monitor chemical reactions in the processPMAOPS101Read dials and indicatorsPMAOPS213Package product/materialQualifications
PMA20116Certificate II in Process Plant OperationsPMA30120Certificate III in Process Plant OperationsWhat to look for
Evidence guide
Look for the protective equipment checked and worn correctly before sampling, the sample point checked, results recorded as raw data with the method, an adjustment calculation that is shown and correct, advice given through the procedure rather than informally, and a resample before release. Shift log entries must be timely and complete.