Receive a hydrochloric acid road tanker into T-105
You are a terminal operator at the Kwinana Beach terminal.
What has happened
A road tanker carrying 20 tonnes of 32 percent hydrochloric acid arrives at loading bay 1 at 8:30 am for tank T-105. The last receipt into T-105 reached 92 percent and activated the high level alarm, and the investigation is open, so receipts are restricted to supervised transfers with a manual dip before and after and a second person checking the ullage calculation. The tank data sheet gives the tank capacity, the safe fill level and the receipt margin. The automatic gauge reads 39 percent, but the weekly manual verification is two days overdue. The driver is new to the site. Aisha Rahman wants the whole receipt recorded in the transfer register with the reconciliation.
Deliverables
- Completed transfer checklist with the checked ullage calculation
- Manual dip records before and after
- Driver briefing record
- Transfer register entry with reconciliation
Documents to use
Systems to use
Bulk Transfer and Tank Inventory Register
Records every receipt, internal transfer and dispatch of bulk product with tank, quantity, gauging and reconciliation.
Control Room Shift Log
Records every operating event, batch, reading, sample result, override and handover from the control room and the field for each shift.
Units of competency
Current on training.gov.au for the Chemical, Hydrocarbons and Refining as at 10 September 2026.
PMAOPS343Transfer bulk fluids into/out of storage facilityPMAOPS240Store fluids in bulkPMAOPS201Operate fluid flow equipmentPMAOPS223Operate and monitor valve systemsPMAOPS204Select and use utilities and servicesQualifications
PMA20116Certificate II in Process Plant OperationsWhat to look for
Evidence guide
The student must recognise the restriction and the overdue gauge verification and act on both, must show a correct ullage calculation checked by a second person, must confirm overfill protection before starting and must remain at the transfer point. Look for the drain-back step before disconnection and a reconciliation that is recorded honestly, including any variance.