Debottleneck the solvent recovery column through management of change
You are a process engineer in Technical Services and Environment.
What has happened
The solvent recovery column is limited to about 85 percent of nameplate feed rate because the reboiler reaches its steam duty limit before the column floods. Customers are being turned away and used solvent is stockpiling in T-310. MOC-26-034 proposes a feed preheater using low pressure steam and a bypass tie-in on the feed line, which will require a hot work permit for the tie-in. The change affects the column heat balance, the relief case, the safe operating limits and the emergency shutdown logic. The reflux pump trip and the six minute limit excursion on 2 September are still under investigation. Ingrid Solberg wants the performance analysis and the complete management of change request, with the hazard assessment and the pre-implementation actions, before the permit for the tie-in can be issued.
Deliverables
- Column performance analysis with bottleneck confirmed
- Heat balance and capacity estimate with assumptions
- Alternatives evaluation
- Completed management of change request with hazard assessment
- Pre-implementation action list and register update
Documents to use
Systems to use
Management of Change Register
Tracks every management of change request from submission to close-out including temporary changes, overrides and their expiry dates.
Control Room Shift Log
Records every operating event, batch, reading, sample result, override and handover from the control room and the field for each shift.
Permit and Isolation Register
Tracks every permit to work, isolation certificate and blind from request to close-out and records permit audits.
Units of competency
Current on training.gov.au for the Chemical, Hydrocarbons and Refining as at 10 September 2026.
PMAOPS601Debottleneck plantPMAOPS600Modify plantPMAOPS500Optimise production systemsPMAOPS511Determine energy transfer loadsPMASUP540Analyse equipment performancePMAWHS502Contribute to safety caseQualifications
PMA50116Diploma of Process Plant TechnologyPMA60116Advanced Diploma of Process Plant TechnologyWhat to look for
Evidence guide
The bottleneck must be confirmed from data, not asserted, and the heat balance must show its assumptions. Look for genuine alternatives evaluated, a hazard assessment that covers relief, materials, trips and the shutdown logic, every affected safety case control measure and safe operating limit identified, and pre-implementation actions that would stop the permit being issued until they are closed. The recommendation must be conditional on the change process, not on schedule pressure.